Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Get 20% off switches when you combine Cisco solutions

 
Labels

Forum Posts

Hi,Let's say I have a stack of two 3750s, 24 ports each (48 ports total).  The backplane is stacked correctly.I also have 20 Servers and switches which need to be availble to network users 24x7x365.How do I plug these 20 servers and switches into the...

cbalowski by Level 1
  • 7180 Views
  • 10 replies
  • 0 Helpful votes

I have an ASA with 2 networks locally communicating with a remote PIX  through a VPN connection. The ASA network 172.16.10.x is communicating through the tunnel to the PIX network 172.16.11.0 just fine as desired. The 2nd network on the ASA is 10.168...

dhall8436 by Level 1
  • 1330 Views
  • 7 replies
  • 0 Helpful votes

Dear All,I would like to as you that i have swich 2960 (10Unit) and switch 3560 ( 3 unit) and router 2821 ( 1 unite) and AP( 10 unit).So do you know software can manage all those product? Like monitor switch up or down, manage configure, check perfor...

Hello Guys,I was adding a new SUP on slot 1 of a 6509 in Hybrid Mode.This switch had been running only on SUP 2 for around 6 months.I added the new SUP, everything Ok. I failed-over the new SUP, everything Ok. I failed-over SUP 2 and the hosts attach...

Dmoreno69 by Level 1
  • 2854 Views
  • 8 replies
  • 0 Helpful votes

Resolved! VLSM

Can anyone please help me out in understanding VLSM. i am having a hard time understanding it. spent alot of time on it and still got nothing out of it. I have the lammle book and i didnt get it right into my head. i want plain and simple method plea...

On September 10, I got this automated email regarding a bug that has been fixed and yet that version has not appeared in the download section yet.anyone knows how long it normally takes for the code to become downloadable. It seems like a long time t...

Hi,I have a Nexus 7K running 5.1.(1a) with N2248T as Fabric Extender.I had two ports on N7K-M132XP-12 module connected to N2248T.In order to activated fex feature I issued the following commands :install feature-set fexfeature-set fexWhen I tried to ...

s-durando by Level 1
  • 10570 Views
  • 13 replies
  • 0 Helpful votes

hi,i am in the proces of upgrading the epld on a 10 gig module to enable fex fabric but i cant and get the following error msgFailure reason: Chain connectivity is broken while upgrading the FPGA i have tried upgrading on other modules which works fi...

Hi,I have the following question:What is the best design to deliver high availability with two Switch 3560 as Core?In the LAN network there are three IP segments and I have two internet links.I appreciate your opinions.

Hi all,hopefully somebody of the forum could help me in here. I have two Cisco 3945e, each router has a SM-D-ES3G-48-P installed which is configured as a simple L2 switch. On one of the modules PoE works properly, on the other module it doesn't works...

shillert by Level 1
  • 1271 Views
  • 2 replies
  • 0 Helpful votes

Hi all,Please can you tell me the feasibility of this scenario :I have a switch which is direcly connected to a router. All Switch ports are used. Devices connected on the switch are all in VLAN 55. in the router i have two available Ethernet interfa...

Hi AllI apologise if this is "newbee" question!I have to plan the configuration of a Catalyst 6500 Series switch. It has 2 48 ethernet port modules.Can the 2 modules be configured as two separate logical switches or do they always have to be the same...

Hi everyone, Thank everyone for their kind words in advance - I'm having to relive some technology Im not as familar with so Im hoping some more experienced than I could lend some information to steer me in the right direction. This was in fact worki...