Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Labels

Forum Posts

Hi There! I'm using Cisco 2960. I've enabled mirror port configuration/ RSPAN for four ports and using the mirror data for traffic analysis on a firewall. The Out traffic of the port is however exceeding the defined limit(10 Mbps) which is resulting ...

aakashv10 by Level 1
  • 321 Views
  • 0 replies
  • 0 Helpful votes

Hi AllI have some questions around netflow and also about an issue.First of all, we have set up netflow monitors on the input and output side, my question is do we really need both directions? what does this give us?The config we apply is below, some...

I have a C3850 and I am trying to route network 192.168.98.0 to the next hop of 192.168.98.2. I can ping across and back with no issues. Any suggestions?ip routing ip route 0.0.0.0 0.0.0.0 192.168.10.1 ip route 192.168.98.0 255.255.255.0 192.168.98.2...

When connecting 2 nexus 93108 with 40Gigabit WSP-Q40GLR4L over 15 meter with single mode cable (with fiber optics patch panel).There is on one side on the first lane a weak receive power on the optical signal.  switch-002# sh int eth1/52 trans det | ...

Resolved! Vlan Best Practice

Hello, I am wondering about the following scenario and if it falls under a best practice. Two locations and each location is identical in terms of equipment and purpose. Let's say location A had a vlan 100 with 172.15.5.0/24 would location B best be ...

dcanady55 by Level 3
  • 5076 Views
  • 6 replies
  • 0 Helpful votes

Resolved! cisco VSS

Hi ,we have two  4506 switches in our company , they want to go for VSS .its running identical now . we want to bring into both the swithces into vss mode .question is we will lose the existing config after converted the switch into VSS mode ? Thanks

Hello everybody.Got this log entry, repeated many times:%SW_MATM-4-MACFLAP_NOTIF: Host 2c76.8aae.410e in vlan 1 is flapping between port Gi1/0/11 and port Gi2/0/12It is happening on a stacked switch...What's this and how to solve it? For me, it looks...

I'm currently tasked with an upgrade 5 switches, from 5Ks to 9Ks. On the day of implementation, i'm upgrading two switches on the first day and the remainng three on the second. In terms of connecting the two new switches, will i just have to switch ...

Hi, I'm working with a Catalyst 3650, using PuTTY as the terminal interface.  I installed a new ios image on friday due to an accidental deletion of the original image from flash (it's now monday). Connection via console cable was working fine on fri...