Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Labels

Forum Posts

Below is my ACL, applied to the interface inbound. Catalyst 2960CX. The first line was intented to allow DHCP. The second is intended to create host isolation. The host connected on this interface has an IP that is part of the network described in li...

Hi all, I have a stack of 4 Catalyst 3850-24X working as a distribution switch, lying in between a Nexus 7K core switch and 34 C3850 access switches/stacks. I was struggling with high CPU utilization problems happening on the distribution switch. I u...

melsayeh by Level 1
  • 17021 Views
  • 17 replies
  • 0 Helpful votes

Hi,We have a site to site vpn between our cisco firewall and Google cloud.10.10.0.4 is on Google cloud10.0.1.215 is behind our firewall.10.10.0.4 can ping and ssh to 10.0.1.215 well.On 10.10.0.4, there is a sftp client to pull data from 10.0.1.215 se...

I'm getting ready to replace some old EOL 2960 and 3560 8 port switches. I'm looking at going with 3560CX or C9200CX 12 port switches. PoE doesn't matter. What are peoples experience with the 3560CX and C9200CX switches? What are pros and cons for th...

I have a network of several PCs whose routing is done using a Cisco 3650 switch. I want to use Cisco Jabber for making calls between 2 PCs. The PCs are configured on Vlan 54 and Cisco Jabber is set on Vlan 60. Each time I want to use Cisco Jabber bet...

Hi all,We are having some new 9300 UXM in production replacing the 3850s, and meet a strange issue.There are some old POE devices running well on 3850. But with the new 9300UXM, we can see the port POE status is up, however the port status shows "not...

Hi Guys,   Is it possible to show the exact temperature value on 2960-G? When I issued command "show env temperature", the switch only displayed information below: SW2960G#sh env temperatureTEMPERATURE is OK   But on my other switch, when I issued th...

I have core switches 6509 and server farm switches 4500 and edge switches 3XXX, could there usually be and shutdown and startup plan for them in case we have a power cut and we are on UPS for a limited time? or there is no such things with switches n...

baselzind by Level 6
  • 484 Views
  • 3 replies
  • 0 Helpful votes
Unanswered Topics