Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Get 20% off switches when you combine Cisco solutions

 
Labels

Forum Posts

I have 4) 3850 switches in a stack with stack power and sharing mode. All the POE devices are on switch 4 and it's almost out of POE power. Can one of the other switches in the stack provide extra POE power for switch number 4? Switch 4 has 30.6 watt...

saleff by Level 1
  • 183 Views
  • 1 replies
  • 0 Helpful votes

Resolved! Vlan lab issue

Dear All, i am coming back to networking after years away and i need your help figuring out whats going on with this lab i am basically following a lab in one of CCNAv7 books i did same configs to my understanding however something isn't right i am s...

Amr Ali by Level 1
  • 378 Views
  • 3 replies
  • 0 Helpful votes

Hi AllHow much stacking kits required for stacking ONE pair of  Cat 9200 (or pair of 9200L) ? Every Stacking kit  includes TWO stacking adapters and one stacking cable.So  is it enough One staking kit to stack One pair of Cat 9200(or pair of 9200L) ?...

aypopoff by Level 1
  • 10102 Views
  • 8 replies
  • 0 Helpful votes

Hi,I'm looking for some advice please regarding ISSU for 2x Cisco 9500 with Stackwise virtual. Previously we have used ISSU to successfully upgrade to Amsterdam 17.3.6 but now looking to carry out ISSU again but to Bengaluru 17.6.5. I have checked th...

markb88 by Level 1
  • 210 Views
  • 1 replies
  • 0 Helpful votes

switch 3560 - I try to upgrade OS on Xmodem but the message shown no space left on device , before the old OS damage I delete all old flashes thank you 

alqasii99 by Level 1
  • 433 Views
  • 4 replies
  • 0 Helpful votes

I have a question, install mode before was a procedure for safe install software. I mean you can install software without commit and if something happened wrong a device perform rollback to before software. My question is now you can't perform upgrad...