Hi we are having issue in configuring QOS markings and prioritization on our 4500-x Core switches. Please see below configurations: access-list 100 permit eigrp any any!class-map match-any EIGRP_TRAFFIC match access-group 100!policy-map EIGRP_POLICY ...

zarjer by Level 1
  • 1655 Views
  • 4 replies
  • 0 Helpful votes

Hello,We have an old Catalyst 4948 and I'm testing the ports on it and am a little confused. Can I use the last four ports on the face-plate (Gi1/45 - Gi1/48)? Whenever I plug in an Ethernet cable into the last four ports, there isn't a light indicat...

Anon01013 by Level 1
  • 3401 Views
  • 11 replies
  • 0 Helpful votes

Hi guys,My port-channel (gi0/47, gi0/48) of 2960 switch connected to a stacked 3750 (contain 02 switches stacked, on 1/0/24 and 2/0/24). Sometimes the 2960 switch is suspended (I have to restart it to make it works), on the 3750 I see the log like th...

beohu by Level 1
  • 1056 Views
  • 4 replies
  • 0 Helpful votes

I'm working on a network design for a large University residential facility. I need to know the maximum noise level of a 9407R with two 3.2kw power supplies installed. The startup noise level.  The data sheet only states 60dB at 50% load, which doesn...

Hi.  Does anyone know if Smart install clients such as the industrial IE3300 are compatible with vstack? The client switch = is downloading the tar-image file but is not extracting the file, and for some reason, the client switch configuration is not...

qukquk by Level 1
  • 592 Views
  • 0 replies
  • 0 Helpful votes

the scenario is :I'm replacing core Cisco switch 4506-E with switch 4507R-E. As I have one supervisor card on 4506-E and I'm going to take out all the card that I have in 4506-E and install it in the new 4507R-E. On the 4507R-E I have 2 slots for the...

ffa1100 by Level 1
  • 1344 Views
  • 4 replies
  • 0 Helpful votes

All,  We are looking at 1 x 9600 Chassis with 4 PSU.The chassis has 6 slot( 2 for supervisor ) and 4 slot available. we plan to use 2 x C9600-LC-48YL( for SFP plus whether fibre or GLC) and 2 x C9600-LC-48TX for copper. Do you see any issues with thi...

cisco8887 by Level 2
  • 495 Views
  • 1 replies
  • 0 Helpful votes

Trying to upgrade my 9500 switch stack to 16.12.03a. Boot is set to packages.conf but when I try to this install command it says it's not there.but it is. what the heck is going on? Any help would be appreciated.  SW9500#install add file bootflash:ca...

sidd76 by Level 1
  • 619 Views
  • 1 replies
  • 0 Helpful votes

Hi, Crruntly I have deployed a C2900 Series Router. My CPU utilization sometimes shoots up to 98%. I have checked using process cpu command & found there is a process called IP Input which is using maximum CPU process. I also have subinterfaces confi...

Its a ws-c3850-48tMy member 4 and 3 are stuck at syncing after power outage. Why is the config not syncing?Tried reloading and unplugging the cables.Should I remove the stack member ? Then plug the cable back in?Something like: https://vmguru.com/201...

VK20 by Level 1
  • 3133 Views
  • 11 replies
  • 0 Helpful votes