We have a Cisco 93180YC-EX.SoftwareBIOS: version 07.56NXOS: version 7.0(3)I4(3) I am trying to enable sflow.  When I do feature sflow it is not an option.  Do I need to upgrade IOS?  When I do a show feature it lists sflow as disabled. 

j2sw by Level 1
  • 822 Views
  • 0 replies
  • 0 Helpful votes

I am looking at pros/cons of using Catalyst 9k (9500) as Layer 3 switch for DC. We currently have Nexus 9500 in DC as layer  2 & 3 but there has been serious issues with Nexus stability and reliability during maintenance and software upgrades. We run...

S891 by Level 2
  • 907 Views
  • 1 replies
  • 0 Helpful votes

Hello - I am looking to use the Nexus 93240YC-FX2 switch in our data center.I have a question on the following ports are allocated:48 x 1/10/25 Gbps fiber ports12 x 40/100 Gbps QSFP28 portshttps://www.cisco.com/c/en/us/products/switches/nexus-93240yc...

johng231 by Level 3
  • 983 Views
  • 0 replies
  • 0 Helpful votes

Hi everyone, i'm studying for the 300-165 and 300-180 exam (CCNP Datacenter) and i'm trying to find some Cisco documentation about fabricpath with MP-BGP control plan. Unfortunately i cannot find nothing. Could anyone help me? Thanks in advance,Marco

MVali95 by Level 1
  • 642 Views
  • 0 replies
  • 0 Helpful votes

Hello, we have 5672UP with N2K-C2232PP-10GE and a numbering of the FEX like this:Rack 56: FEX 156, now I need in a Rack a second FEX.Can I use the slot-command to enable slot 2, so I had Interfaces 156/1/x and 156/2/x ? there is not much documentatio...

gaigl by Level 3
  • 908 Views
  • 1 replies
  • 0 Helpful votes