Data Center Switches

cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Save 25% on Day-2 Operations Add-On License

 

Forum Posts

We have to migrate FI uplink ports from one Nexus N9Ks vPC pair to a new Nexus N9Ks vPC pair.1. We are planning to shutdown FI-A uplink ports which connects to both switches on the first vPC  pair and wait for all hosts to reconnect on FI-B uplink.2....

Sar@ by Level 1
  • 118 Views
  • 0 replies
  • 0 Helpful votes

I am seeking assistance in comprehending the functionality of APIC controller shards.While I grasp the concept of having a shard leader elected for each replica, specifically for write operations, my confusion arises from the presence of four APICs. ...

TomMik by Level 1
  • 123 Views
  • 0 replies
  • 0 Helpful votes

Not sure what is going on here: 93180-01-CORE(config)# logging server 172.24.0.243 facility local6 use-vrf default93180-01-CORE(config)# show logging serverLogging server: enabled{172.24.4.11}server severity: notificationsserver facility: local7serve...

I'm trying to upgrade NX-OS on a 7010 in our lab (to verify something for change control), and no matter how I transfer the system image, it has a bad (or different) MD5 than the source system image. I initially tried transferring the source image vi...

Hi Team, I have 36 Port 100G Switch C9236C ,Can I connect both port Gi1/100G & Gi2 /100G  through splitter cable and connect to next hope NIC ,NIC card has 200GB port  (NIC: 900-9X7AH-0078-DTZ NVIDIA ConnectX-7 HHHL Adapter Card, 200GbE ) Which Split...

sachinc01 by Level 1
  • 186 Views
  • 0 replies
  • 0 Helpful votes

Hi guys, I know Cisco Nexus switches don't support VSS or StackWise stacking, just vPC. The idea is the same and to view the two switches as one from the downlink device's perspective. But I think vPC is more complex, at least in terms of configurati...