Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Get 20% off switches when you combine Cisco solutions

 
Labels

Forum Posts

We  have connected 2 cisco switches running pvst+ to 2 non cisco  switches(nortel) which support pvst in a mesh topology. cisco1 is  root for vlan 10 (backup for vlan 20), cisco2 root for vlan20 (backup for vlan10). cisco1----cisco2   |              ...

we have   two core swiches 6506 and  around 55 cat 3550 switches. currently we are on the process of replacing   the cat 3550 switches to 3750 switches.We need 10/1000/1000  speed, ip base image with upgrade options. Our up links from cat 3550s(sfps)...

prakavi by Level 1
  • 1731 Views
  • 13 replies
  • 0 Helpful votes

Hey all ,i have a message that appears when i run a debug on my switch :Core1#pak 5884A9C consumed in input feature , packet consumed, MCI Check(63), rtype 0, forus FALSE, sendself FALSE, mtu 0, fwdchk FALSE i would appreciate if someone can explain ...

AJ Asaad by Level 1
  • 340 Views
  • 1 replies
  • 0 Helpful votes

Aug 20 00:40:13.086: %SEC-6-IPACCESSLOGP: list telnet permitted tcp x.x.x.x(62488) -> 0.0.0.0(23), 1 packetthis meassage occures frequentlynote that the ip x.x.x.x  is a subinterface in the same router !!!!!!!!wt does this log mean??regards

Dr.X by Level 2
  • 826 Views
  • 4 replies
  • 0 Helpful votes

just installed our first 10Gb uplink..2960s > 4510R with SUP7. link is running really slow. Users are unable to load data from remote databases on the LAN. We are getting a lot of "errors in". Is on new new SM Fiber install. Error In is showing on 4...

psiegling by Level 1
  • 410 Views
  • 2 replies
  • 0 Helpful votes

Hello,I have 2 x 3750's in a stack, switch 2 is the master.  We only have 5 hosts in each switch so we decided to move all hosts into switch to and removed switch 1 as we need it elsewhere.  Anyway all worked fine, but I wanted to tidy the config up ...

Hello everyoneWe have experienced a network outage due to a port-channel going down. Checking the logs we have seen the following messages:%SPANTREE-3-PRESTD_NEIGH: pre-standard MST interaction not configured (Port-channel3). Please, configure: 'span...

Hi,we are in the planning phase for a network upgrade. We have two C2960 Switches connected via one (L2) Etherchannel (4x1 Gbit/s) which works very well. In the next phase we would like to upgrade our router to an 2911 series which has 3 gb interface...