Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Labels

Forum Posts

Add a "Server-PT" to your Network connected to the VLAN with IP Addressing of 192.168.2.0 (This should be where your "PC_West" systems are.)Label the Server "WebSrvr"Make the page state your name - Icon in addition would be coolStatically assign the ...

OpenDoors by Level 1
  • 862 Views
  • 2 replies
  • 0 Helpful votes

          Hi, I have a problem with a Switch 2960 and a telephone Avaya, its activate the command port securit, the topology is Switch 2960 port + Avaya telephone + PC and the configuration the port is:         Interface FastEthernet0/16description P...

hi all,we have purchased from an old company 7 3850s which are stacked together, they have flattened them so we need to configure them all againi know how to configure/set up individual cisco switches, so my question is, do i need to console into eac...

hello, i see error on FEX FAN: show environment fex 125 fan Fan Fex : 125: ------------------------------------------------------ Fan Model Hw Status ------------------------------------------------------ Chassis N2K-C2232-FAN -- failure PS-1 N2200-...

from88 by Level 4
  • 1950 Views
  • 6 replies
  • 0 Helpful votes

Hi  I just installed switch c9500 with the default version 16.12.04.I don't understand the smart license, what I want to ask:- Is smart license mandatory?- If not registered, how long is the evaluation period ? the switch function cannot be used ?* F...

Show Version.JPG Show License Summary.JPG
Hary_CsC by Level 1
  • 1903 Views
  • 7 replies
  • 0 Helpful votes

Hello,for our Meraki environment we are planning to replace our old non PoE switches to the brand new Cisco CBS250 series.As I know the Meraki MR46 AP 30W power for booting and operating. I am not sure and I won´t understood it wrong. On the CBS250 s...

I bought a WS-C6509 chassis for a trainee and test lab, it was manufactured in 1999.I already purchased a FAN tray, two power units and 3 line cards (2x mini GBICs, 1x RJ54 ports). Now I bought a supervisor engine (WS-SUP720-3B). However, during the ...

dennis.u by Level 1
  • 3084 Views
  • 10 replies
  • 0 Helpful votes

Dear all,I'm searching for a switch able to cope with 10Gbit/s transfer rates (for a small, personal, cluster built from multiple workstations).Recently, I found this switch on sale: sg300-10sfp. I'm not sure it only works at 1Gbit/s or at 10Gbit/s.....

Hi all, I want to confirm the PSU of the chassis WS-C6509-E is faulty or not. So my question is, by look at the system alarm, its confirmed that the PSU is failed: - environmental alarms: system minor alarm on power-supply 1 power-output-fail (raised...

Hafiz_HR by Level 1
  • 756 Views
  • 2 replies
  • 0 Helpful votes

There are two 9606. Each has 2 Supervisor Engine 1.Is it possible to configure the cluster in between so that all four Supervisor Engine 1 are involved?If so, how do you do it? thanks

Trum by Level 1
  • 739 Views
  • 3 replies
  • 0 Helpful votes