Application Centric Infrastructure

Join the ACI conversation. Jump into this space for access to peers and industry experts. You’ll find the latest updates, helpful resources, and assistance when you need it.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Forum Posts

Dear All I have the problem about APIC and ASAv (single vm) integration. I am using APIC 1.2(1i), I have successful import ASAv device package 1.2 into APIC, you can check on picture_01.png. Then I try to create L4-L7 device under Tenant, I put all r...

tumarha by Level 1
  • 1737 Views
  • 2 replies
  • 0 Helpful votes

Building an ACI environment without the OOB-Mgmt interfaces connected. I have the APIC OOB mgmt interfaces connected for build, but eventually the switch they are connected to is going away and no capacity for leaf/spine interfaces. Currently receiv...

Resolved! APIC server crash?

Hello Guys, I have 3 APIC controllers, one of them is up and running with 2 leafs and 2 spines. I  was trying to work on the 2nd APIC and want it to join the cluster but somehow I think I might have crashed the 2nd APIC after rebooted it few times. ...

I am running APIC version 1.2(1i) and am trying to setup/create an L4-L7 device - a virtual F5 running 11.5.1.  I have the latest F5 device package (version 1.2) installed as well.  I've walked through all the steps a bunch of times but I keep gettin...

bremackel by Level 4
  • 1449 Views
  • 5 replies
  • 0 Helpful votes