Cisco Catalyst Center

This community is for technical, feature, configuration and deployment questions. For production deployment issues, please contact the TAC!
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Labels

Forum Posts

Thank you for joining us for the Expert Insights Series on Cisco Catalyst Center: Empowering Catalyst Center Excellence!  Our Customer Success Specialists Max Tellez and Irvin Mendiola will be available from June 26, 2025 through July 11, 2025. Wheth...

matellez - Lindsey Bledsoe Taylor.jpg irmendio - Lindsey Bledsoe Taylor.jpg

I was notified from Cisco that my C9300 DNA Essentials is about to expire. Product number C9300-DNA-E-48=.We're a small shop, and if I recall correctly, we were required to purchase DNA with the switch as a mandated SKU. If I understand correctly, "D...

ceva156 by Level 1
  • 2478 Views
  • 8 replies
  • 0 Helpful votes

Been struggling with DNAC compliance reporting with ACLs. I have a basic sample ACL that deploys successfully but the compliance in DNAC flags the entire ACL ac non-compliant. I can see the ACL in the config on the switch and in the configuration in ...

Positron by Level 1
  • 1450 Views
  • 4 replies
  • 0 Helpful votes

Hey everyone, So I've run into a scenario I've not encountered before with a DNA Centre appliance. The customer wants to move it from one DC to another which means we have to change its IP Address, now I'm familiar with changing the IP through Maglev...

I was tasked with configuring Dynamic Address Resolution Protocol (ARP) Inspection (DAI) for user VLANS.  As I was adding the VLANs and enabling DAI my switch suddenly reboot.  I was able to recover so I thought it must have been a fluke- so I tried ...

John N by Level 1
  • 829 Views
  • 4 replies
  • 0 Helpful votes

Hi,Is there anyone encounter issue when do Cat9k IOS patching to version 17.09.05. Before start proceed with Software Update, there is readiness check result need to be done/pass. What we had encounter is the readiness check failed at stage "Flash ch...

YH Chua by Level 1
  • 1492 Views
  • 11 replies
  • 0 Helpful votes

Anyone been in the situation where an existing switch/stack of 2 * C9300 was onboarded in DNAC/CCC but at some point in time the stack is reduced to 1 switch and the other switch needs to be re-onboarded because it will server in another building. (b...

Have issue when connection between switches.3172pq to c9500-48Y4C.  The interface is set to 10GB at the 3172 with 1000baseSX, GLC-SX-MMD SFP at each each. The c9500-48Y4C does not have speed setting.  Get a speed mismatch error. Any help is appreciat...